Land Rover Defender: Battery and Charging System
READ NEXT:
SPECIFICATIONS
Startup battery
Startup battery disconnect/connect
CAUTIONS:
The vehicle status and start up battery condition must be established
before attempting battery disconnect
/connect. R
DESCRIPTION AND OPERATION
1. INTRODUCTION
This document defines the requirements for care and maintenance of lead acid
startup and auxiliary batteries, and the
standard of battery care at retailers f
DESCRIPTION AND OPERATION
BATTERY CARE SHEET
Replacement startup and auxiliary batteries for service.
NOTE:
Fields marked with * are mandatory and must be completed.
Do the battery care requirements
SEE MORE:
DESCRIPTION AND OPERATION
The Permit To Work (PTW) shall be completed by a single Electric Vehicle
Authorised Person (EVAP) only.
COMPLETE SECTIONS 1,2 AND 3 BEFORE THE HIGH VOLTAGE SYSTEM POWER DOWN
SECTION 1: IDENTIFICATION OF VEHICLE TO BE WORKED ON
SECTION 2: DESCRIPTION OF WORK TO BE PERFORME
REMOVAL AND INSTALLATION
PART(S)
REMOVAL
NOTE:
This procedure contains some variation in the illustrations depending
on the vehicle specification, but the
essential information is always correct.
This procedure contains illustrations showing certain components
removed to provide extra clari
© 2010-2025 Copyright www.lrdefender.org
